Chesterfield Tunnel
Chesterfield Tunnel
![The tunnel's current concrete-encased entrance at its southern end.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image1-96.jpg)
![Flooding is a problem for much of the tunnel's length.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image2-96.jpg)
![Colourful contrast: orange sludge against blue brick.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image3-96.jpg)
![An elegant refuge suffers from water ingress.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image4-95.jpg)
![A row of cable hangers heads north into the gloom. Water and mud can reach a depth of 4 feet further into the tunnel.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image5-95.jpg)
![Towards its northern end, access into the tunnel is possible via a hatch perched above Chesterfield's Inner Relief Road.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image6-94.jpg)
![The tunnel's original south portal took the form of a bridge which carried Hollis Lane over the railway.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image7-92.jpg)
![A single ventilation shaft, spanning the full width of the tunnel, was provided 85 yards from its southern end.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image8-82.jpg)
![To accommodate the Relief Road, the section of tunnel south of the shaft was opened out and the current access ramp constructed.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image9-70.jpg)
![Also lost to the road was the tunnel's northernmost 25 yards, together with this imposing portal and its datestone.](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image10-55.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image1-96.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image2-96.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image3-96.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image4-95.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image5-95.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image6-94.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image7-92.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image8-82.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image9-70.jpg)
![](http://www.forgottenrelics.org/wp-content/uploads/2023/03/image10-55.jpg)
June 1892 saw the arrival of the Manchester Sheffield & Lincolnshire Railway in Chesterfield, having built a line from its main north-south route at Staveley. Within months, a southern extension was opened to form ‘the Chesterfield loop’, passing immediately through a straight tunnel of 474 yards which emerged from under Hollis Lane. Towards its southern end was a single full-width ventilation shaft.
The through route was severed in June 1963 but the tunnel continued to serve Hydes Siding until 13th January 1964. By the summer of 1985, its northern portal and 25 yards of brickwork had been cut back to accommodate Chesterfield’s new Inner Relief Road. At the south end, the 85-yard section from the shaft to the portal was also lost, with an access ramp constructed for inspection and maintenance purposes.
Today, the southern end remains open, hemmed in by concrete retaining walls. However, without effective drainage, the tunnel is now prone to flooding, the depth of which is reported to reach several feet on occasions.